Courtesy Ford - Conyers

1636 Dogwood Dr Conyers, GA 30013

2024 BMW M4 Competition at Courtesy Ford - Conyers

2024 BMW M4 Competition

Selling Price: $73,000

Vehicle Basics

  • Vehicle Make : BMW
  • Vehicle Model : M4
  • Condition : Used
  • Mileage : 23,066
  • VIN : WBS33BA09RCN85034
  • Stock # : 25T911A
  • Engine :
  • Transmission : 8-Speed Automatic Sport
  • Ext. Color : Blue
  • Int. Color : Black
  • Vehicle Type : Convertible
  • Body Style : 2D Convertible
  • Drivetrain : AWD
City MPG * 16 Hwy MPG * 23

*Actual MPG rating will vary with options, driving conditions, habits and vehicle condition.

Clean CARFAX. Priced below KBB Fair Purchase Price!

Courtesy Ford Conyers
1636 Dogwood Drive , Conyers, GA 30013
770-922-2700

This 2024 BMW M4 Competition in Portimao Blue Metallic features: 2D Convertible, 3.0L I6 Turbocharged DOHC 24V LEV3-ULEV70 503hp, 8-Speed Automatic Sport, AWD, **LOCAL TRADE**, **ORIGINAL MSRP $97,785**, 16 Speakers, 4-Wheel Disc Brakes, ABS brakes, Adaptive Ride Package, Adaptive suspension, Adaptive Suspension, AM/FM radio: SiriusXM with 360L, Android Auto, Apple Carplay, Auto High-beam Headlights, Auto LED Headlights, Auto-dimming door mirrors, Auto-dimming Rear-View mirror, Automatic temperature control, Backup Camera, Blind Spot Monitoring, Bluetooth w/ Audio Streaming, BMW Assist eCall, BMW Curved Display w/HUD, Brake assist, Carbon Fiber Trim, Cold Weather Package, Connected Package Pro, ConnectedDrive Services, Convertible roof lining, Convertible roof wind blocker, Delay-off headlights, Electronic Stability Control, Emergency communication system: BMW Assist eCall, Executive Package, Extended Merino Leather Upholstery, Exterior Parking Camera Rear, Four wheel independent suspension, Foward Collison Alert, Front Center Armrest, Front dual zone A/C, Fully automatic headlights, Garage door transmitter, Glass rear window, harman/kardon Surround Sound System, harman/kardon Speakers, Heated door mirrors, Heated Front Seats, Heated Steering Wheel, Illuminated entry, Integrated roll-over protection, Lane Departure Warning, Leather Seats, Leather steering wheel, Low tire pressure warning, Lumbar Support, M Shadowline Lights, M Sport Seats, Memory Package, Memory seat, Navigation System, Neck Warmer, Outside temperature display, Overhead console, Panic alarm, Parking Assistance Package, Parking Assistant Plus, Performance Handling Package, Performance Package, Power convertible roof, Power door mirrors, Power Front Seats, Power Mirror Package, Power Package, Power passenger seat, Premium Audio Package, Premium Sound Package, Push Button Start, Radio data system, Rain sensing wipers, Rear seat center armrest, Remote Engine Start, Remote keyless entry, Remote Start, Security system, SiriusXM w/360L, Speed control, Speed-sensing steering, Speed-Sensitive Wipers, Sport steering wheel, Steering wheel mounted audio controls, Telescoping steering wheel, Tilt steering wheel, Traction control, Trip computer, Turn signal indicator mirrors, Wheels: 19" x 9.5" Fr/20" x 10.5" Rr (Style 826M), Widescreen Display, Wireless Charging Pad.

Certified. Certification Program Details: Ford Blue Certified Details: * Vehicle History * 139 Point Inspection * Roadside Assistance * Limited Warranty: 3 Month/4,000 Mile (whichever comes first) after new car warranty expires or from certified purchase date * Warranty Deductible: $100 * Transferable Warranty * and 11,000 FordPass Rewards Points to use toward first maintenance visit


**NOT ALL PRE-OWNED CARS & TRUCKS COME WITH 2 KEYS**

Browse Other Vehicles at Courtesy Ford - Conyers

Dealership Info

Courtesy Ford - Conyers

Courtesy Ford - Conyers

Vehicle Features

  • Wheels: 19" x 9.5" Fr/20" x 10.5" Rr (Style 826M)
  • M Sport Seats
  • Extended Merino Leather Upholstery
  • Radio: AM/FM Audio System
  • Parking Assistance Package
  • Executive Package
  • M Shadowline Lights
  • Carbon Fiber Trim
  • Neck Warmer
  • Remote Engine Start
  • Heated Steering Wheel
  • Power Front Seats
  • Lumbar Support
  • Heated Front Seats
  • Parking Assistant Plus
  • SiriusXM w/360L
  • harman/kardon Surround Sound System
  • BMW Assist eCall
  • BMW TeleServices
  • ConnectedDrive Services
  • Connected Package Pro
  • Personal eSIM 5G
  • Navigation
  • BMW Curved Display w/HUD
  • Widescreen Display
  • Apple CarPlay & Android Auto Compatibility
  • 4-Wheel Disc Brakes
  • Emergency communication system: BMW Assist eCall
  • AM/FM radio: SiriusXM with 360L
  • harman/kardon® Speakers
  • Auto High-beam Headlights
  • Exterior Parking Camera Rear
  • Compass
  • 16 Speakers
  • Speed-Sensitive Wipers
  • Auto-dimming Rear-View mirror
  • Front beverage holders
  • Variably intermittent wipers
  • Turn signal indicator mirrors
  • Trip computer
  • Traction control
  • Tilt steering wheel
  • Telescoping steering wheel
  • Steering wheel mounted audio controls
  • Sport steering wheel
  • Speed-sensing steering
  • Speed control
  • Security system
  • Remote keyless entry
  • Rear window defroster
  • Rear seat center armrest
  • Rear reading lights
  • Rear anti-roll bar
  • Rain sensing wipers
  • Radio data system
  • Power windows
  • Power steering
  • Power passenger seat
  • Power driver seat
  • Power door mirrors
  • Power convertible roof
  • Passenger vanity mirror
  • Passenger door bin
  • Panic alarm
  • Overhead console
  • Outside temperature display
  • Occupant sensing airbag
  • Memory seat
  • Low tire pressure warning
  • Leather steering wheel
  • Knee airbag
  • Integrated roll-over protection
  • Illuminated entry
  • Heated front seats
  • Heated door mirrors
  • Glass rear window
  • Garage door transmitter
  • Fully automatic headlights
  • Front reading lights
  • Front dual zone A/C
  • Front anti-roll bar
  • Four wheel independent suspension
  • Dual front side impact airbags
  • Dual front impact airbags
  • Driver vanity mirror
  • Driver door bin
  • Delay-off headlights
  • Convertible roof wind blocker
  • Convertible roof lining
  • Bumpers: body-color
  • Brake assist
  • Automatic temperature control
  • Auto-dimming door mirrors
  • Alloy wheels
  • Adaptive suspension
  • ABS brakes
  • Tachometer
  • Navigation System
  • Leather Shift Knob
  • Front Center Armrest
  • Front Bucket Seats
  • Electronic Stability Control
  • Air Conditioning

Disclaimer & Legal Info

Prices do not include additional fees and costs of closing, including government fees and taxes, any finance charges, any dealer documentation fees, any emissions testing fees or other fees. All prices, specifications and availability subject to change without notice. Contact dealer for most current information. Prices are valid thru the close of business, today only.

***Pricing of vehicles, unless otherwise noted, does not include Taxes, Title, License, Registration, and $150 Documentation Fee.***